stock2.jpg (26443 bytes)

The following pictures are scanned from old stereo cards, postcards and pictures. For more details refer to the All Time Roster page.


#1 Hero, later named Peppersass shown in 1866 during the demonstration run on the temporary track From a stereoview by Kilburn Bros


#1 Peppersass shown on July 20. 1929 making her last run up the mountain. She was wrecked later that day.



1st. #2, built in 1868 by Walter Aiken, resembles the Peppersass. It was rebuilt in 1869


#2 GeorgeStephenson after being rebuilt in 1869


3rd. #2 Eagle built in 1878 by Manchester Loco Works



#3 Built in 1869 carried no name. Built by Walter Aiken



2nd. #3 Hercules built in 1874 by Manchester Loco Works. First horizontal boiler


 


#4 Atlas built in 1870 by Walter Aiken

 


2nd. #4 Atlas built in 1875 by Manchester Loco Works



#5 Cloud built in 1870 by Walter Aiken


2nd. #5 Cloud biult in 1876 by Manchester Loco Works



#6 Tip-Top built in 1874 by Manchester Loco Works. First engine with 4 cylinders.


2nd. #6 Tip-Top built in 1878 by Manchester Loco Works



#7 Falcon built in 1883 by the Manchester Loco Works



M-1 Spirit of '76 built in 1974-76 at the MW Cog shop. Experimental Diesel


M-1 Diesel


Track Speeder, Green Hornet built in 1975 at the Cog shop



Track Speeder capable of ascending the mountain in 15 minutes!


 

[ Devils Shingle | Picture Library | Links | Books | MAIN PAGE | Search the Cog | Frequently Asked Questions | Schedule | History | Alltime Roster | All Aboard | Old Peppersass | What is a Cog Railway | Guestbook | ]